Qunitessential Berkeley! Legal condo H/E essentially SFR.Private but minutes to UC;secluded wooded setting;unique property!Large rm & full ba in lower level suitable for office/study;perfect for faculty NSTT-3aug
Single-familyProperty Type
1921Year Built
8,760 sq ftLot Size
$860Est. Price/Sq.Ft.
Listed by Francine Di Palma•DRE #00925299• PRUDENTIAL CALIFORNIA REALTY3
Bought with Wendy Yee•DRE #00866538• CENTURY-21 HARTFORD PROPERTIES
bridgeMLS, Bay East AOR, or Contra Costa AOR #20028539
Sep 15, 2000
Sold
$350,000
$404/sq ft
Aug 12, 2000
Listing Removed
—
Jul 31, 2000
Listed
$329,000
$379/sq ft
bridgeMLS, Bay East AOR, or Contra Costa AOR #29006104
May 11, 1999
Sold
$270,000
$311/sq ft
Mar 24, 1999
Listing Removed
—
Mar 16, 1999
Listed
$247,000
$285/sq ft
$247,000., 51 Canyon Rd. quintessential Berkeley cottage 1BD/1BA plus non-conforming 1BD/1BA. Directly above UCB Campus. Carmel like setting.
Year
Property tax
Land + Additions
Assessment*
2025
$8,686 (+8.8%)
$161,370 + $376,530
$537,900
2024
$7,984 (+2.1%)
$158,206 + $369,148
$527,354
2023
$7,820 (−1.0%)
$155,104 + $361,911
$517,015
2022
$7,900 (+2.5%)
$149,083 + $347,860
$496,943
2021
$7,704 (+5.3%)
$149,083 + $347,860
$496,943
2020
$7,317 (+3.7%)
$146,160 + $341,040
$487,200
2019
$7,055 (+1.6%)
$144,661 + $337,543
$482,204
2018
$6,941 (+3.7%)
$141,825 + $330,926
$472,751
2017
$6,691 (−2.7%)
$136,319 + $318,078
$454,397
2016
$6,877 (+7.4%)
$136,319 + $318,078
$454,397
2015
$6,405 (+0.6%)
$133,647 + $311,843
$445,490
2014
$6,367 (−1.0%)
$129,062 + $301,146
$430,208
2013
$6,430 (+3.8%)
$129,062 + $301,146
$430,208
2012
$6,195 (+2.2%)
$128,480 + $299,786
$428,266
2011
$6,060 (+1.0%)
$125,961 + $293,909
$419,870
2010
$6,000 (−1.1%)
$123,491 + $288,146
$411,637
2009
$6,065 (+4.1%)
$122,569 + $285,995
$408,564
2008
$5,825
$122,861 + $286,676
$409,537
Tax history for 51 Canyon Rd
Year
Property tax
Land + Additions
Assessment*
2025
$8,686 (+8.8%)
$161,370 + $376,530
$537,900
2024
$7,984 (+2.1%)
$158,206 + $369,148
$527,354
2023
$7,820 (−1.0%)
$155,104 + $361,911
$517,015
2022
$7,900 (+2.5%)
$149,083 + $347,860
$496,943
2021
$7,704 (+5.3%)
$149,083 + $347,860
$496,943
2020
$7,317 (+3.7%)
$146,160 + $341,040
$487,200
2019
$7,055 (+1.6%)
$144,661 + $337,543
$482,204
2018
$6,941 (+3.7%)
$141,825 + $330,926
$472,751
2017
$6,691 (−2.7%)
$136,319 + $318,078
$454,397
2016
$6,877 (+7.4%)
$136,319 + $318,078
$454,397
2015
$6,405 (+0.6%)
$133,647 + $311,843
$445,490
2014
$6,367 (−1.0%)
$129,062 + $301,146
$430,208
2013
$6,430 (+3.8%)
$129,062 + $301,146
$430,208
2012
$6,195 (+2.2%)
$128,480 + $299,786
$428,266
2011
$6,060 (+1.0%)
$125,961 + $293,909
$419,870
2010
$6,000 (−1.1%)
$123,491 + $288,146
$411,637
2009
$6,065 (+4.1%)
$122,569 + $285,995
$408,564
2008
$5,825
$122,861 + $286,676
$409,537
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Beds
2
Baths
2
Stories
2
Lot width
—
Lot depth
—
Lot size
—
Year renovated
1921
Sq. Ft.
867
Year built
1921
Style
Condo/Co-op
County
Alameda County
APN
055 186205500
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Sep 16, 2026.
ES-R
Environmental Safety-Residential District
The specific purpose of the Environmental Safety-Residential district is to: Provide a means to implement the General Plan and the Hazard Mitigation Plan to reduce the potential for life loss, injury, and economic damage to Berkeley residents from earthquakes, wildfires, and landslides and to protect the City's unique character and values from being compromised by hazard events by reducing the vulnerability of one of the most unique and inaccessible neighborhoods in the Hill Hazardous Fire Area; Protect the lives and property of Panoramic Hill residents in Berkeley and adjoining parts of Oakland and avoid destruction or damage to the natural environment through the application of special development regulations and by ensuring that the review of new development and alterations or additions to existing structures will require analysis and mitigation of geologic, seismic, and fire hazards; Limit the uses of land permitted to those which are necessary to serve the housing and access needs of the district's inhabitants and will not put either current or future residents at risk due to the area's inadequate infrastructure and special vulnerability to natural hazards; Protect the health and safety of current and future residents by ensuring that no new dwelling units will be built and no land may be subdivided to allow the construction of additional dwelling units until plans are in place that identify the future distribution, location, and extent of development in the Berkeley and Oakland neighborhoods of Panoramic Hill, including provisions to develop and maintain a system of public facilities and services adequate to meet the needs of the future population; Establish procedures to ensure that the development review process provides for consideration of the cumulative impact of new construction, alterations, and changes in use that have the potential to increase the population or intensify the use of land in the district together with the impacts of other projects on Panoramic Hill and within adjacent areas of Berkeley and Oakland; Restrict the size and occupancy of residential structures by imposing standards that reflect the district's limited capacity to accommodate additional population due to poor access, inadequate infrastructure, vulnerability to natural hazards and the fact that a majority of the existing development does not conform to standards that the City adopted in 1979; Assure the effective use of emergency measures available to save lives and property; Give reasonable protection to views and privacy, yet allow appropriate development of all property as long as public services and access are adequate to ensure protection of the health and safety of residents in this vulnerable area; and Protect the integrity of the Panoramic Hill Historic District by ensuring that alterations to existing buildings and new construction maintain the existing pattern of development, are appropriate to the hillside setting, and do not impair the architectural significance of contributing structures.
Property information provided by bridgeMLS, Bay East AOR, or Contra Costa AOR when last listed in 2000. This data may not match public records. Learn more.