*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Zoning and permits
Zoning
Permits
EC
PUD
Employment Center Zone
The purpose of the EC zone is to provide a flexible zone for employment-generating uses in a pedestrian-friendly setting with ample open space. The EC zone also provides for a variety of supporting uses, including retail, residential, and light industrial. The close proximity of supporting uses allows for pedestrian, bicycle, transit, and rideshare-connection opportunities, which collectively help reduce dependence on the automobile. Consequently, parking needs are reduced and shared parking opportunities increase. The EC zone was developed specifically for North Natomas, but may be applicable to other areas of the city if the site is appropriate for a flexible, mixed-use, employment-generating complex.
Zone overlays
Planned Unit Development
Permitted uses
Include but are not limited to:
Bank
Restaurant
Housing-Multiple units
Housing-Student
Manufacturing
Warehouse
Hotel / motel
Office
Research & development
Post office
Jul 17, 2025 • Final
Commercial repair-maintenance
Repair a garage damaged by a vehicle by replacing studs, shear walls, and stucco with like-for-like materials. Update the scope of work to use conventional framing and remove the strong wall from the original plans.
Remodel
Mar 11, 2024 • Final
Commercial water heater
Replace an existing gas water heater with a new gas water heater located inside the building.
Gas
Plumbing
Water heater
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.
Property details
Exterior
Exterior Information
Building Construction Quality: Good
Property Information
Subdivision Name: NATOMAS XING AREA 01
Ground Floor Sq. Ft: 146,041
Building Sq. Ft: 429,346
# of Stories: 3
Stories Type: 1 1/2
Legal Description: NATOMAS CROSSING AREA 1, LOT 1
Lot Information
# of Buildings: 1
Land Sq. Ft: 822,413
Legal Lot Number: 1
Municipality Name: SACRAMENTO, CITY OF
Acres: 18.88
Zoning Code: MIXED
County Use Description: APT-300-399 UNITS
Location Information
Parcel Location Influence: Canal
Financial
Assessor Information
Assessment Year: 2026
Tax Area: SACRAMENTO, CITY OF
Public facts
Beds: —
Baths: —
Sq. Ft.: 429,346
Stories: 3.0
Lot Size: 18.88 acres
Style: Multi-Family (5+ Unit)
Year Built: 2003
Year Renovated: 2003
County: Sacramento County
APN: 22500701050000
Home facts updated by county records on Sep 9, 2026
Around this home
Schools
Natomas Park Elementary School
Public K-5 • Assigned • 0.6mi
4/10
Natomas Middle School
Public 6-8 • Assigned • 1.5mi
2/10
Inderkum High School
Public 9-12 • Assigned • 0.5mi
7/10
Provided by GreatSchools
Lifestyle
Provided by Walk Score and Local Logic
Climate risks
6/10 Flood Factor
Estimated 67-75% chance of a flood reaching the building in the next 30 years
1/10 Fire Factor
Unlikely to be in a wildfire in next 30 years
7/10 Heat Factor
7 days above 102° expected this year, 15 days in 30 years
1/10 Wind Factor
Minimal risk of severe winds over next 30 years
10/10 Air Factor
29 unhealthy days expected this year, 33 days in 30 years
Provided by First Street
Historical weather
Sacramento, CA • 95834
Average low and high temperatures (°F)
59
41
64
45
74
49
75
50
85
56
92
60
95
62
97
63
89
63
80
54
63
46
55
44
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Sun exposure
In this area, properties receive around 13.6 hours in
June and 4.6 hours in December, placing it above the
U.S. average for solar exposure.