Welcome to this bright, airy, and spacious 3-story home in the highly sought LaScala community within walking distance to Colma BART station. With easy access to 280 & 101, Serramonte Mall, Metro Center, Gellert Marketplace, Westlake Shopping Center, Costco, Target, Best Buy, Home Depot, and Kaiser. This 2-bedroom, 2.5-bathroom home with central heat, and an open floor plan is boasting elegant design, vaulted ceilings, desirable LVP floors, and abundance of natural light through double pane windows with higher-grade insulation. The upper level offers a master suite with walk-in-closet and dual vanity, a 2nd suite with big closet, and a value-added sitting area. The main level includes an appointed gourmet kitchen with stainless steel appliances, custom cabinetry and pantry, quartz countertops, center island, open dining area next to the living room. The ground level features an office, and a 2-car garage with washer/dryer. Please come to deeply appreciate its comfort and elegance.
TownhomeProperty Type
2017Year Built
$596Est. Price/Sq.Ft.
2 car garageParking
Listed by Su-Lan Wang•DRE #01956204• Coldwell Banker Realty
Contact: 650-798-7070
Bought with Tracy Ong•DRE #01908891• Sequoia Real Estate
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Beds
2
Baths
2.5
Stories
3
Lot width
—
Lot depth
—
Lot size
—
Year renovated
2017
Sq. Ft.
1,477
Year built
2017
Style
Townhouse
County
San Mateo County
APN
117190110
Parking Spaces
2
Basement
No
Accessible
No
HOA Dues
$408 /month
Garage
Yes
Features
—
Last updated by owner on Jun 5, 2026.
PC
DR
Planned Colma Zoning District
Encourage the development of a densely-developed, mixed-use, pedestrianoriented neighborhood that supports the area’s intended transportation/transit role, and complements the character of the adjacent neighborhoods and business districts, as described in the BART Station Area Specific Plan.; Establish the type, location, intensity and character of development to occur in the area, while allowing for creative and imaginative design concepts, as described in the BART Station Area Specific Plan.; Assure that development conforms with the policies, requirements and standards of the BART Station Area Specific Plan.; Implement the policies of the San Mateo County General Plan.