Welcome home~ This won't last! Dont miss this rare opportunity to own this contemporary home. This is a single story (SFR)Single Family Residence was built in 1956. Features 4 bedrooms/2 bathrooms, New Appliances, new laminant wood floors, Fresh paint on Living room and Kitchen. All fenced in backyard and front yard, greenbelt, two car garage, possible RV or Boat parking, approx. 1267 living space, & approx 10,860 Lot size. Covered Patio on wood deck. Lemon trees, matured rose tree, . Reroofed in 2018, great neighborhood, Close to schools, California State University, Concord Bart Station.
Single-familyProperty Type
1957Year Built
10,850 sq ftLot Size
$654Est. Price/Sq.Ft.
2 car garageParking
Listed by Fe Manzano•DRE #01719170• Coldwell Banker Realty
Contact: 408-598-0073
Bought with Steven Lam•DRE #02078128• Keller Williams
As the MLS and public records start to fill up, we'll list the details here.
Public record
Public record
Zoning
Permits
Beds
—
Baths
—
Stories
—
Lot width
—
Lot depth
—
Lot size
—
Year renovated
—
Sq. Ft.
—
Year built
—
Style
Single Family Residential
County
Contra Costa County
APN
—
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Nov 3, 2024.
RS10
Residential Single-Family District
The RS district is applied to areas of the city appropriate for single-family residential uses in neighborhoods at densities of 2.5 to 10 units per net acre, subject to appropriate standards. The RS zoning districts generally apply to the single-family residential districts with development existing at the time of the adoption of this development code. The specific allowable density for each parcel is shown on the zoning map by a numerical suffix residential density designator RS-10 corresponding to the minimum lot size 10000. The RS district is consistent with and implements the low density residential (LDR) land use designation of the general plan.
Permitted uses
Include but are not limited to:
Housing-Single unit
Housing-Senior
Recreation
Agriculture-Cropland
Agriculture-Grove / orchard / vineyard
Park & open space
Sep 9, 2024 • Final
Solar pv
Install a solar photovoltaic system and an energy storage system. No main service panel upgrade is included.
Battery
Electrical
Solar
Nov 1, 2023 • Final
Solar pv
Install a solar photovoltaic system and an energy storage system. No main service panel upgrade is included.
Battery
Electrical
Electric meter
Solar
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.
Property details
Parking
Parking Information
Garage (Minimum): 2
Garage (Maximum): 2
Parking Description: Boat Dock, Detached, Guest/Visitor Parking, Off-Site Parking, On Street