Poised with understated elegance, this one of a kind, 5 BR, 3 full bath, new construction will captivate all. Located in the heart of Downtown Palo Alto, just steps away from Johnson Park and University Avenue’s many iconic attractions. No stone was left unturned during this complete remodel; from foundation up to the second-floor addition, this open-concept features gorgeous lighting fixtures, a car charger, smart locks, smart garage door, video doorbell, USB chargers throughout and much more! Indulge this chief’s kitchen with Décor appliances. In addition to the walk-in pantry, this kitchen takes center-stage with quarts countertops, a 48-inch gas range with down drafting hood, built-in convection ovens, a wine refrigerator and luminous under-cabinet lighting. A dual-zone forced air climate system by Nest, tankless water heater, and gas fire pit are also provided. Possible eligibility for the Mills Act tax break per the historical registry. Application deadline by March 15th, 2017.
Single-familyProperty Type
1925Year Built
5,925 sq ftLot Size
$2,087Est. Price/Sq.Ft.
1 garage spacesParking
Listed by Denise Villeneuve•DRE #01794615• Intero Real Estate Services
Listed by Jordan Shields•DRE #02006566• Intero Real Estate Services
Contact: 650-274-8560
Bought with Jennifer Gilson•DRE #01889172• KW Advisors
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
5
Baths
3
Stories
2
Lot width
—
Lot depth
—
Lot size
5,925
Year renovated
2015
Sq. Ft.
2,215
Year built
1925
Style
Single Family Residential
County
Santa Clara County
APN
12002017
Parking Spaces
3
Basement
No
Accessible
No
HOA Dues
—
Garage
Yes
Features
Views
Last updated by owner on May 4, 2019.
R-1
Single Family Residential District
The R-1 single family residential district is intended to create, preserve, and enhance areas suitable for detached dwellings with a strong presence of nature and with open area affording maximum privacy and opportunities for outdoor living and childrens play. Minimum site area requirements are established to create and preserve variety among neighborhoods, to provide adequate open area, and to encourage quality design. Accessory du, junior accessory du and accessory structures or buildings are appropriate. Community uses and facilities, such as churches and schools, should be limited unless no net loss of housing would result.
Permitted uses
Include but are not limited to:
Housing-Single unit
Housing-Multiple units
Housing-Senior
Housing-Mobile home park
May 3, 2022 • Final
Project - building
Install a roof-mounted solar system and an energy storage system on a residential building.
Battery
Electrical
Solar
Nov 16, 2021 • Active
Revision-building
Update the project plans to reflect the installed system, including revisions to the cover sheet, site plan, and three-line diagrams.
Electrical
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.