Lot 82 - Grove Village in Santa Rosa features solar included homes. This beautiful home features 3 bedrooms with loft, LG kitchen appliances, including optional LG refrigerator, white kitchen cabinets, designer selected luxury vinyl plank flooring and much more!
Single-familyProperty Type
2,700 sq ftLot Size
$378Est. Price/Sq.Ft.
2 car garageParking
Listed by Melissa Jean•DRE #02127017• City Ventures Construction, Inc
•707-478-1990 (agent)
•wilborn.melissa@gmail.com (agent)
Listed by Maryellen Villalta•DRE #01431343• City Ventures Construction, Inc
•415-732-9691 (agent)
•mvillalta@cityventures.com (agent)
Bought with Manoj Khatri•DRE #02084890• Kc's Real Realty & Mortgage
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
3
Baths
2.5
Stories
2
Lot width
—
Lot depth
—
Lot size
2,700 Sq. Ft.
Year renovated
2025
Sq. Ft.
2,022
Year built
2025
Style
Single Family Residential
County
Sonoma County
APN
134430082000
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Aug 13, 2026.
R-1-6
Single-Family Residential District - 6,000 sq ft
The R-1 zoning district is applied to areas of the City intended to be maintained as residential neighborhoods comprised of detached and attached single-family houses, clustered Residential hillside projects, and small multi-family projects, together with compatible accessory uses. The maximum allowable density ranges from two to 13 dwellings per acre, with the specific allowable density for each parcel shown on the zoning map by a numerical suffix to the R-1 map symbol see Section 20-22.040. The R-1 zoning district implements and is consistent with the Residential Very Low Density where residential clustered on hillsides is desirable, Low Density or Open Space, Low Density, and Medium Low Density land use classifications of the General Plan.
Permitted uses
Include but are not limited to:
Agriculture-Other
Day care facility
Healthcare-Other
Housing-Single unit
Housing-Student
Housing-Other
Infrastructure-Other
Housing-Mobile home park
Feb 26, 2025 • Final
Residential new
Construct a new two-story single-family home with a garage and a covered porch. Install a photovoltaic system prior to the final inspection.
Electrical
New construction
Solar
Jun 28, 2024 • Active
Residential addition-alteration
Install a solar energy system with modules on a residential building.
Battery
Electrical
Solar
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.