A Challenger Home, built in 2017. Large open floor plan, with room for everyone. Large bedrooms, each with a walk-in closet. Upstairs is a large loft and in the basement is a huge family room. The home has a solar system to offset electric bills. Garage has a tandem bay on one side. All measurements and Metro District info is considered to be accurate but is the buyer's responsibility to check details.
Single-familyProperty Type
2017Year Built
8,450 sq ftLot Size
$149Est. Price/Sq.Ft.
3 car garageParking
Listed by Dawn Maslowski• Keller Williams Clients Choice Realty
Bought with Pamela Palone Abr Crs Rei Sres• RE/MAX Properties Inc
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
4
Baths
4
Stories
2
Lot width
—
Lot depth
—
Lot size
8,470 Sq. Ft.
Year renovated
—
Sq. Ft.
3,650
Year built
2017
Style
Single Family Residential
County
El Paso County
APN
5301101046
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Sep 2, 2026.
PUD
Planned Unit Development District
The Planned Unit Development (PUD) district is a versatile zoning mechanism to encourage innovative and creative design and to facilitate a mix of uses including residential, business, commercial, and industrial, recreation, open space, and other selected secondary uses. This zoning district is established in accordance with C.R.S. 24-67-101, et seq., to accomplish the following objectives: To further the public health, safety and general welfare within El Paso County; To permit adjustment to changing public and private needs and to foster the ability to provide development patterns which are more compatible with and effective in meeting such needs; To improve the design, character and quality of new development with flexibility by varying lot size, building heights, setback controls and other site development requirements; To encourage innovations in residential, commercial, and industrial development and renewal so that the growing demands of the population may be met by greater variety in type, design, and layout of buildings including mixed use and traditional neighborhood design and by the conservation and more efficient use of open space ancillary to said buildings.
May 19, 2022 • Final
434
Install a photovoltaic solar system on a residential building.
Electrical
Solar
Aug 11, 2017 • Final
101
Work on a residence.
New construction
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.
Property details
Parking
Parking Information
# of Garage Spaces: 3
Garage Type: Attached
Garage Amenities: Even with Main Level, Garage Door Opener