BEST PRICED 2,500 SQUARE FOOT HOME IN CLEARWATER!! Largest floor plan available in Hillcrest Estates! This custom built 4 bedroom, 2 ½ bath home is only 7 Miles to world famous Clearwater Beach. Original owner was the builder. Custom built in shelving in Family room and bedrooms. Master Bedroom has both a walk in closet and standard closet. Eat in kitchen with walk in pantry. Spacious yard perfect for the green thumb of the family. Extra long driveway would fit multiple cars. French doors from the Family room lead out to a large screened enclosed porch. Great area for entertaining. Extra large lot 100 X 135 plenty of room for a pool! Great location close to US 19, quick access to Belcher. Spectrum field less then 1 1/5 miles for the baseball fans! Shopping & restaurants less then a mile away.
Single-familyProperty Type
1969Year Built
0.31 acresLot Size
$205Est. Price/Sq.Ft.
2 car garageParking
Listed by Lisa Saraceno• CHARLES RUTENBERG REALTY INC
Bought with John McIntosh• KELLER WILLIAMS REALTY PORTFOLIO COLLECTION
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
—
Baths
2
Stories
1
Lot width
100 ft.
Lot depth
135 ft.
Lot size
0.31 Acres
Year renovated
1990
Sq. Ft.
2,554
Year built
1969
Style
Single Family Residential
County
Pinellas County
APN
162907399240000050
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Aug 13, 2026.
R-2
Single-Family Residential District
The R-2, Single-Family Residential District provides for areas of single-family residential development located where moderate density single-family uses are desirable.
Permitted uses
Include but are not limited to:
Garden center
Day care facility
Housing-Group
Housing-Single unit
Infrastructure
Recreation
Communications tower
Housing-Mobile home park
Park & open space
Apr 25, 2022 • Final
Building combo
Install a roof-mounted photovoltaic solar system. A notice of commencement is required on the job site.
Electrical
Solar
Oct 9, 2020 • Final
Express building
Remove and replace shingles on a residential building. Install new underlayment.
Roofing
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.