NEW CONSTRUCTION WITHOUT THE WAIT: 1 year young Adams build in Eagle Lake. Front and back porches bookend this spacious four bedroom two bath home. Step in the front door and choose your path, living room dining room or family room. Dining room leads to kitchen with stainless steel appliances including Whirlpool refrigerator, GE stove and microwave. Breakfast bar and dining area open to the family room. Master bedroom suite is 18x13 complimented by master bath with separate tub and shower. Your upgrades include blinds installed throughout, gutters, irrigation well and whole house surge protector. Spotless garage floor has epoxy finish. Come take a look and call this home!
Single-familyProperty Type
2019Year Built
0.39 acresLot Size
$196Est. Price/Sq.Ft.
2 car garageParking
Listed by Christine King• REALTY EXECUTIVES OCEANSIDE
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Beds
4
Baths
2
Stories
1
Lot width
—
Lot depth
—
Lot size
0.39 Acres
Year renovated
2019
Sq. Ft.
2,145
Year built
2019
Style
Single Family Residential
County
Flagler County
APN
35-12-31-2010-00000-0830
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Jul 10, 2026.
PUD
Planned Unit Development District
The purpose and intent of the planned unit development PUD is to provide an opportunity for innovative urban design techniques, improved use of land, protection of valuable natural features in the community, desirable land use mix, open space, and more economical public services. The purpose of this provision is to encourage the unified development of large tracts of land using more creative and flexible concepts in site planning than would otherwise be possible through the strict application of minimum and maximum requirements of conventional land use districts established in this article. The proposed PUD must be in harmony with the general purpose of the article and the countys comprehensive plan. The design and construction of a PUD project shall follow a carefully devised plan of development which must be prepared in accordance with the requirements, procedures and approvals herein prescribed.