Lush rolling hills, a beautiful gated entry and a quaint wooden bridge overlooking a gentle cascading stream welcomes you home to this Oasis model. This area of the community features the largest lots and this former model home is among them. It is sited on an oversized lot adjacent to the walking path with no rear neighbors, open space and gracious hillside views. This single story has been meticulously kept in move-in condition with upgrades including a whole house water filtration system and a covered, screened lanai. The floor plan is very open with high ceilings, a spacious entry foyer, attractive drop zone entry from garage and large inside laundry. Each of the 3 bedrooms offers privacy and both bathrooms have double sinks. There is a private study/office separate from the other living spaces. The kitchen is open to an expansive, light filled great room. This single story home, in its premier location, is unlike any other available within Sullivan Ranch. Sullivan Ranch features a southern-style 5,000 sq. ft. clubhouse, an outdoor fireplace, a Jr. Olympic-sized pool, an incredible playground and amazing dog park. .. .all located just minutes from the fine dining, eclectic shopping and entertainment of downtown Mount Dora.
This is a Lovely Atwater- a longtime favorite- Model Home on an outstanding home site. The fourth bedroom is set up as a flex room. Currently under renovation but ready for move in very soon! This is your chance to own a fantastic Home in a beautiful neighborhood. Pictures are used for illustration purposes only and make not reflect the exact elevation, colors and options.
Year
Property tax
Land + Additions
Assessment*
2025
$3,152 (+2.9%)
2024
$3,064 (+10.5%)
2023
$2,774 (+6.8%)
2022
$2,597 (+3.6%)
2021
$2,507 (−4.3%)
2020
$2,619 (+0.9%)
2019
$2,596 (−16.1%)
2018
$3,094 (+3.0%)
2017
$3,005 (+0.4%)
2016
$2,994 (−17.7%)
$60,000 + $150,450
$210,450
2015
$3,638 (+2.9%)
$60,000 + $147,141
$207,141
2014
$3,536 (+428.1%)
2013
$670 (−1.0%)
2012
$677
Tax history for 21632 Sullivan Ranch Blvd
Year
Property tax
Land + Additions
Assessment*
2025
$3,152 (+2.9%)
2024
$3,064 (+10.5%)
2023
$2,774 (+6.8%)
2022
$2,597 (+3.6%)
2021
$2,507 (−4.3%)
2020
$2,619 (+0.9%)
2019
$2,596 (−16.1%)
2018
$3,094 (+3.0%)
2017
$3,005 (+0.4%)
2016
$2,994 (−17.7%)
$60,000 + $150,450
$210,450
2015
$3,638 (+2.9%)
$60,000 + $147,141
$207,141
2014
$3,536 (+428.1%)
2013
$670 (−1.0%)
2012
$677
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Beds
3
Baths
2
Stories
1
Lot width
—
Lot depth
—
Lot size
0.31 Acres
Year renovated
2019
Sq. Ft.
2,144
Year built
2013
Style
Single Family Residential
County
Lake County
APN
33-19-27-0300-000-26000
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Jul 23, 2026.
PUD
WEKIVA STUDY AREA
Planned Unit Development District
Planned Unit Developments Shall be allowed in all Land Use classifications. It is the purpose and intent of this Section to establish a Planned Unit Development (PUD) zoning district in effort to:Exercise greater ingenuity and imagination in the planning and Development of Tracts of Land under unified control than generally is possible under these regulations; Allow a diversification of uses, Structures, and Open Space in a manner compatible with both the surrounding, existing and approved Development of Land surrounding and abutting the PUD Site; Provide a means for Land to be used more effectively, and for utilization of smaller networks of utilities and Roads; Detail the natural amenities of Land encouraging scenic and functional Open Space within the PUD; Provide for the reasonable protection of Designated Species of plants and animals; Ensure that Development will occur according to limitation of use, design, Density, and phasing stipulated on an approved Development Plan; and Provide reasonable assurance of approval of a PUD application before a Developer expends complete design monies, while providing the County with assurances that the PUD will be Developed according to approved specifications.