Move in Ready Just in time to cool off in the summer with the family. POOL HOME! 3 bedroom, 2 full bathrooms, 2 car garage, single family home. Vaulted ceiling, eat in kitchen with breakfast bar, sliding door to pool from the Kitchen area. Split floor plan shower and tub combo in guest bathroom. Brand new carpeting. Walk in closets, ceiling fans in all rooms. Master bedroom opens to the pool with walk in closets. Dining area, Large open Living Room with French doors that also opens to the Pool Area with covered area to sit by the pool and keep cool with 3 ceiling fans. Pool has a child safety fence. Fenced in yard. Newer AC, Solar Panels to heat the Pool new Hot water Heater, Garage is screened. Yard is beautifully landscaped with a gorgeous front entrance. Close to shopping, entertainment, beaches, SunWest, Shopping and so much more. Minutes to Suncoast Parkway 30 minutes from Tampa and the Airport. Owner is open to holding a mortgage with a reasonable down payment. This home won't last long.
Single-familyProperty Type
1990Year Built
10,000 sq ftLot Size
$183Est. Price/Sq.Ft.
2 car garageParking
Listed by Gena Taylor• COLDWELL BANKER FIGREY&SON RES
Bought with Jon McCall, PA• KW REALTY ELITE PARTNERS
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Beds
3
Baths
2
Stories
1
Lot width
—
Lot depth
—
Lot size
10,000 Sq. Ft.
Year renovated
1997
Sq. Ft.
1,733
Year built
1990
Style
Single Family Residential
County
Hernando County
APN
R32 323 17 5200 1275 0190
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Jul 27, 2026.
PDP(SF)
Planned Development Project-Single-Family District
The planned development project PDP is a specialized zoning district which provides a level of density and/or intensity, and a list of permitted uses. A narrative description and a master plan are part of the PDP zoning. The master plan is a visual depiction of the general layout of the project in conformance with the PDP rules with any additional performance standards or specific deviations requested. The process for approval of a PDP zoning is through the zoning amendment process as provided for in this ordinance. This master plan must be reviewed and approved by the governing body. The list of permitted PDP districts are contained in Section 5 of this article and the requirements related to PDP districts are contained in article VIII of this Code.