Brand New Construction in great area of Kings Mountain! This home sits on a jumbo lot with over an acre of land. Open concept floorplan with an eat-in kitchen, white shaker cabinets, quartz counters, subway tile backsplash, and stainless steel appliances. Tall 9' ceilings throughout and enormous vaulted ceilings in main living area. Beautiful finishes throughout the home including custom trim package, matte black hardware, and huge deck overlooking the backyard. Jumbo sized master bedroom with tray ceiling and European tilt and turn windows and LVP floors for easy maintenance. Master bedroom features an en-suite bath with double vanity, tiled shower and massive walk-in closet. This is a must see!
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
3
Baths
2
Stories
—
Lot width
—
Lot depth
—
Lot size
1.05 Acres
Year renovated
—
Sq. Ft.
1,538
Year built
2024
Style
Single Family Residential
County
Gaston County
APN
156816
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Jul 17, 2026.
R-1
Single-Family Limited
The purpose of this district is to accommodate single-family site built and modular construction. The minimum lot size allowed in this district will be dependent on the provision of public or community water and sewer facilities. Although areas may be served with such utilities, most of these areas are located beyond existing or anticipated utility service coverage areas. The minimum lot size for residential uses in this district is therefore larger than in other residential zoning districts.
Permitted uses
Include but are not limited to:
Religious facility
Housing-Single unit
Educational / school
Dec 11, 2024 • Final
New single-family home (residential)
Construct a new residential building.
New construction
Aug 27, 2024 • Final
Zn - new construction – single family residential
Obtain a zoning permit for new residential construction. A foundation survey must be approved and on file prior to the framing inspection. All construction must remain outside of powerline and utility rights of way.
New construction
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.