Recently remodeled Tri-level home with lots of room! 3 bedroom 2.5 baths! Spacious kitchen with updated cabinets, granite counter tops, hardwood floors, and tile back splash. New light fixtures and plumbing fixtures through out. All new carpet. tile and laminate flooring upstairs. Bathrooms have been remodeled & updated with new floors, fixtures etc. Fresh Paint through out. Master suite has new carpet, new walk in shower, and a sunroom that overlooks backyard. Lower level has laundry room and a large rec room area and/or separate den with tile flooring, recess lighting and fresh paint. Oversized 2 car attached garage. Two tier deck on back. Just mins to I-85, Conv't to Rockwell, Salisbury, and Concord. Carson High School! 100% USDA financing eligible. Rowan County taxes.
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
3
Baths
2.5
Stories
1
Lot width
—
Lot depth
—
Lot size
15,681
Year renovated
2022
Sq. Ft.
1,798
Year built
1972
Style
Single Family Residential
County
Rowan County
APN
422A067
Parking Spaces
2
Basement
No
Accessible
No
HOA Dues
—
Garage
Yes
Features
Pool
Last updated by owner on Sep 8, 2022.
RA
Rural Agricultural
This district is developed to provide for a minimum level of land use regulations appropriate for outlying areas of the county. These outlying areas typically consist of rural single-family housing, larger tracts of land used for agricultural purposes, and instances of nonresidential uses intermingled. Multifamily uses are discouraged in this district. This district would provide for protection from the most intensive land uses while containing provisions for a variety of home-based business opportunities and other nonresidential uses deemed appropriate through a special use permit process. It is the intent of this district to rely upon development standards to protect residences from potential adverse impacts of allowed nonresidential uses. The most intensive land uses would not be allowed in this district.
Permitted uses
Include but are not limited to:
Greenhouse / nursery
Livestock production
Religious facility
Housing-Single unit
Educational / school
Fire house
Police station
Post office
Agriculture-Cropland
Park & open space
Jun 25, 2024 • Final
Accessory building - storage building
Construct a storage building.
ADU
Jun 25, 2024 • Final
Electrical - phase 1
Construct a storage building and install a new electrical service.
Electrical
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.