*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
—
Baths
3
Stories
1.5
Lot width
—
Lot depth
—
Lot size
0.57 Acres
Year renovated
2022
Sq. Ft.
2,796
Year built
2022
Style
Single Family Residential
County
Wake County
APN
0687.03 22 4244 000
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Aug 11, 2026.
RA
Residential Agricultural District
The Residential Agricultural (RA) Zoning District is intended to permit proposed and existing large zoning lot single-family detached dwellings in established neighborhoods and to provide for lower density, rural residential zoning lot (stick-built or modular unit) development and agricultural farming operations, forestry management, farmsteads, public or private parks and greenways. This district may accommodate residential use on a zoning lot with a minimum size of 20,000 square feet, at a density not to exceed 2.18 single-family detached dwelling units per gross acre with one public utility, or with a community water system approved by the Wake County Health Department. If a septic tank and well for each zoning lot is proposed the minimum lot size shall be 30,000 square feet, approved by the Wake County Health Department or as amended in the future. Optional development in this district may also include open space developments, permitted in accordance with Article F Use Regulations, section 91255, l(4) and household living, Article F, section 9-1255, m., both of which require public utilities and the thoroughfare improvements in accordance with the Community Transportation Plan. The Town may extend public utilities the transportation system and/or other infrastructure networks into or through this district. As the Town's infrastructure network is expanded or extended, a relative change may be reflected in development density, typically reflected through a change in zoning district classification.
Feb 19, 2025 • Final
Accessory structure application for wastewater
Construct a detached garage with a potential finished upstairs area.
New construction
Feb 17, 2025 • Final
Residential - accessory building
Construct a detached garage.
ADU
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.