All offers subject to interior inspection. OK to walk outside ONLY. Zoned RM2. Build 6 units or fix up current home. Buyer to do due diligence. No value in home.The RM2 zone is a medium-scale multi-dwelling. Housing is characterized by 3-4 story buildings. The types of development will include a range of multi-dwelling structures, four-plexes and rowhouses. NEW LOWER PRICE*** Price lower so possibly rehab and rent? Or fix and flip?
Single-familyProperty Type
1946Year Built
4,791 sq ftLot Size
$294Price/Sq.Ft.
Listed by Connie Brockway• Elite Realty
Bought with Darryl Bodle• Keller Williams Realty Portland Premiere
ATTN: BUILDERS/INVESTORS !! GREAT POTENTIAL HERE! R1-zoning build 3-4 units on this .11 acre lot or make current home your own. Near downtown Portland, the bus, new future MAX LINE, freeway, hospitals, Starbucks, and new Safeway. Existing home has good bones. It was built in 1946 w/ fir floors, comp roof and vinyl windows, 2 bedrooms,1 bath, laundry room. Buyer to do due diligence and confirm with city requirements. Zoning R1
RMLS #15244625
Aug 4, 2015
Sold
$160,000
$200/sq ft
Apr 17, 2015
Pending
—
Apr 14, 2015
Listed
$159,000
$199/sq ft
+2
Short Sale - 1 lender Chase. Super fixer-total rehab needed. House is completed gutted to studs. Possible tear-down - Cash Only. Adjacent to I-5 freeway. Value is in land in my opinion. Needs everything!!
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
2
Baths
1
Stories
1
Lot width
—
Lot depth
—
Lot size
4,750 Sq. Ft.
Year renovated
1946
Sq. Ft.
800
Year built
1946
Style
Single Family Residential
County
Multnomah County
APN
R103586
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Nov 16, 2023.
RM2
Residential Multi-Dwelling 2 zone
The RM2 zone is a medium-scale multi-dwelling zone that is generally applied in and around a variety of centers and corridors that are well-served by transit. Allowed housing is characterized by buildings of up to three or four stories with a higher percentage of building coverage than in the RM1 zone, while still providing opportunities for landscaping and outdoor spaces that integrate with residential neighborhood characteristics. The major types of new housing development will be a diverse range of multi-dwelling structures and other compact housing that contribute to the intended urban scale of centers and corridors, while providing transitions in scale and characteristics to lower-scale residential neighborhoods.
Permitted uses
Include but are not limited to:
Housing
Housing-Group
Housing-Single unit
Housing-Multiple units
Housing-Senior
Sep 7, 2023 • Final
Mechanical
Install a mini-split system with an outdoor unit and an indoor wall head. Install bathroom vents, a dryer vent, and a kitchen vent.
Electrical
HVAC
Nov 21, 2022 • Final
Electrical
Install a temporary electrical service.
Electrical
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.
Property details
Interior
Interior Features
Basement: Crawl Space
Bathroom Information
Bathrooms Full: 1
Bathrooms Full Main Level: 1
Bathrooms Total Integer: 1
Bathrooms Total Main Level: 1
Baths Total: 1
Room 7 Information
Description: 2nd Bedroom
Room 9 Information
Description: Dining Room
Room 10 Information
Description: Family Room
Room 11 Information
Description: Kitchen
Room 12 Information
Description: Living Room
Room 13 Information
Description: Primary Bedroom
Level: Main
Room 14 Information
Description: Great Room
Exterior
Exterior Features
Roof: Composition
Exterior Description: Wood Siding
Lot Information
Lot Size Square Feet: 4,791
Lot Size Range: 3,000 to 4,999 SqFt
Lot Size Acres: 0.11
Lot Size: 3,000 to 4,999 SqFt
Parcel Number: R103586
Road Surface Type: Paved
Property Information
Property Type: Residential
Property Sub Type: Single Family Residence
Property Attached YN: No
Property Condition: Fixer
Main Level Area Total: 800
View YN: No
Building Information
Year Built: 1946
Building Area Total: 800
Building Area Description: Title
Building Area Calculated: 800
Financial
Tax Information
Tax Year: 2019
Tax Legal Description: ALDER SPRINGS, BLOCK 12, LOT 3 TL 6600
Tax Annual Amount: $2,747.59
Utilities
Utility Information
Green Certification YN: Yes
Fuel Description: Electricity
Water Source: Public Water
Sewer: Public Sewer
Heating & Cooling
Heating YN: No
Cooling YN: No
Location
School Information
Elementary School: Capitol Hill
Middle Or Junior School: Jackson
High School: Wilson
Location Information
Directions: I-5 South to take Barber Blvd blvd to 19th and left to property
Unparsed Address: 8415 SW 19TH AVE, Portland, OR 97219
Community Information
Senior Community YN: No
Zoning: RM2
Public facts
Beds: 2
Baths: 1.0
Sq. Ft.: 800
Stories: 1.0
Lot Size: 4,750 square feet
Style: Single Family Residential
Year Built: 1946
Year Renovated: 1946
County: Multnomah County
APN: R103586
Home facts updated by county records on Nov 16, 2023
Other
Listing Information
MlsStatus: Sold
Listing Price Information
Price Type: List Price
New Construction Information
New Construction YN: No
Around this home
Schools
Capitol Hill Elementary School
Public K-5 • Assigned • 0.1mi
9/10
Jackson Middle School
Public 6-8 • Assigned • 1.2mi
8/10
Ida B. Wells-Barnett High School
Public 9-12 • Assigned • 1.0mi
8/10
Provided by GreatSchools
Lifestyle
Provided by Walk Score and Local Logic
Climate risks
1/10 Flood Factor
Minimal risk of a flood reaching the building in the next 30 years
1/10 Fire Factor
Unlikely to be in a wildfire in next 30 years
3/10 Heat Factor
7 days above 91° expected this year, 14 days in 30 years
1/10 Wind Factor
Minimal risk of severe winds over next 30 years
10/10 Air Factor
19 unhealthy days expected this year, 20 days in 30 years
Provided by First Street
Historical weather
Portland, OR • 97219
Average low and high temperatures (°F)
47
37
49
38
56
43
64
45
70
50
77
54
83
59
84
62
75
58
61
49
52
44
50
42
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Sun exposure
In this area, properties receive around 9.6 hours in
June and 2 hours in December, placing it below the
U.S. average for solar exposure.
9.6 hrs
2 hrs
JuneDecember
Provided by Shadowmap
Work with an experienced agent and save on fees. 3 minutes to get started.