Beautiful new construction townhome in the heart of Graduate Hospital! This three bedroom, three and a half bath home with garage features hardwood floors and high end fixtures throughout. Enter into a spacious living room, dining room and kitchen on the second floor. Kitchen boasts raised panel cabinetry, granite countertops, undermount stainless steel sink, stainless steel appliances, breakfast bar, and working island. The third floor features two bedrooms and two bathrooms, with a tub with ceramic tile surround and polished nickel Mohen fixtures. The master bathroom features a shower stall with tile sourround and polished nickel Mohen fixtures. Exit to massive 24'x16' roof deck. Home comes with security system. Garage parking to tops it off - this home is a must see!
TownhomeProperty Type
2008Year Built
1,120 sq ftLot Size
$343Est. Price/Sq.Ft.
1 spaceParking
Listed by • Coldwell Banker Realty
•215-923-7600 (broker)
•cbpoldcityadmins@cbpref.com (broker)
Bought with Linda Amsterdam• BHHS Fox & Roach At the Harper, Rittenhouse Square
Vacant lot, measuring 16 x 70, in the exciting Graduate Hospital area of the city! Fabulous development opportunity. Conveniently located to Center City shopping and business districts, Rittenhouse Square, South Street and public transportation.
Year
Property tax
Land + Additions
Assessment*
2026
$9,320 (−13.1%)
$153,160 + $612,640
$765,800
2025
$10,720 (+10.0%)
$153,160 + $612,640
$765,800
2024
$9,745
$139,240 + $556,960
$696,200
2023
$9,745 (+12.2%)
$139,240 + $556,960
$696,200
2022
$8,686
$157,390 + $463,110
$620,500
2021
$8,686
$157,390 + $463,110
$620,500
2020
$8,686 (−2.3%)
$157,390 + $463,110
$620,500
2019
$8,887 (+136.0%)
$161,043 + $473,857
$634,900
2018
$3,766 (+124.7%)
$135,830 + $399,670
$535,500
2017
$1,676 (−70.9%)
$119,774 + $352,426
$472,200
2015
$5,750
$35,460 + $393,640
$429,100
2014
$5,749 (+1,571.5%)
$35,460 + $393,640
$429,100
2013
$344 (+3.6%)
$3,520 + $44,480
$48,000
2012
$332 (+3.9%)
$3,520
2011
$320
$3,520
Tax history for 2129 Carpenter St
Year
Property tax
Land + Additions
Assessment*
2026
$9,320 (−13.1%)
$153,160 + $612,640
$765,800
2025
$10,720 (+10.0%)
$153,160 + $612,640
$765,800
2024
$9,745
$139,240 + $556,960
$696,200
2023
$9,745 (+12.2%)
$139,240 + $556,960
$696,200
2022
$8,686
$157,390 + $463,110
$620,500
2021
$8,686
$157,390 + $463,110
$620,500
2020
$8,686 (−2.3%)
$157,390 + $463,110
$620,500
2019
$8,887 (+136.0%)
$161,043 + $473,857
$634,900
2018
$3,766 (+124.7%)
$135,830 + $399,670
$535,500
2017
$1,676 (−70.9%)
$119,774 + $352,426
$472,200
2015
$5,750
$35,460 + $393,640
$429,100
2014
$5,749 (+1,571.5%)
$35,460 + $393,640
$429,100
2013
$344 (+3.6%)
$3,520 + $44,480
$48,000
2012
$332 (+3.9%)
$3,520
2011
$320
$3,520
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
3
Baths
3
Stories
3
Lot width
16 ft.
Lot depth
70 ft.
Lot size
1,120 Sq. Ft.
Year renovated
—
Sq. Ft.
2,028
Year built
2007
Style
Townhouse
County
Philadelphia County
APN
302219400
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Oct 20, 2026.
RM-1
/NIS
/CTR - RESIDENTIAL PARKING CONTROL
/CTR - CENTER CITY RESIDENTIAL DISTRICT CONTROL
Residential Multi-Family-1 District
The RM, Residential Multi-Family districts are primarily intended to accommodate moderate- to high-density, multi-unit residential buildings in areas where such development already exists or where it is desired in the future. The Zoning Code includes four RM districts. These districts are differentiated primarily on the basis of allowed minimum lot area per unit and allowed building heights.
Zone overlays
Narcotics Injection Sites Overlay District
Center City Overlay District - Center City Residential District Control Area
Permitted uses
Include but are not limited to:
Assembly / meeting place
Community / recreation center
Religious facility
Garden center
Housing-Single unit
Housing-Multiple units
Housing-Senior
Fire house
Police station
Recreation-Other
Jan 29, 2009 • Final
Ep_electrl
Install electrical components including duplex receptacles, single pole and three-way switches, dimmers, and light outlets. Install smoke detectors, a chime kit, recessed lighting, and paddle fans. Provide electrical circuits for gas heating, air conditioning, a washer, a dryer, a dishwasher, a microwave, and a range. Install a new electrical service with a circuit panel.
Electrical
Jul 31, 2008 • Final
Pp_plumbng
Install a curb trap and water service. Install drain, waste, vent, and potable water systems for bathrooms and a kitchen. Work includes installing water closets, a kitchen sink, lavatories, and bathtubs.
Plumbing
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.