Listed by Ted Leland • Abbey Realty Inc. Bought with Coldwell Banker Bain.
Off Market Nov 2020 for $400K
$573,344
Est. refi paymentEst. refi$2,395/mo
3
bd
•
2.5 ba
•
2,176
sq ft
3306 Ruddell Loop SE, Lacey, WA 98503
About this home
Large 3 car detached garage/shop with room for an RV. Amazing brand new deck surrounds the home and leads down to a private concrete fire pit area. Enjoy a large .39 acre lot with fenced dog run. Home has upgraded wood laminate floors, vaulted ceilings and 2 inviting gas fireplaces. Upstairs you have a master suite with private bath and balcony. Downstairs you'll find a family room with gas fireplace, bonus room, office space, 2 bedrooms and guest bath. New roof in 2017. 11 minutes to JBLM.
House sits on a large lot with plenty of privacy. Detached 3 car garage, with space for two cars and a shop. There is a deck and outdoor patio with fire pit. Master suite on upper level with two bedrooms and additional living area downstairs.
8 years ago• May not reflect the current state of the home
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
3
Baths
2.5
Stories
3
Lot width
—
Lot depth
—
Lot size
17,397
Year renovated
2022
Sq. Ft.
2,176
Year built
1977
Style
Single Family Residential
County
Thurston County
APN
32960000200
Parking Spaces
3
Basement
No
Accessible
No
HOA Dues
—
Garage
Yes
Features
—
Last updated by owner on Apr 4, 2022.
LD
Low-Density Residential District
It is the intent of this chapter to: Enhance the residential quality of the city by providing a high standard of development for residential; Allow a broad range of housing options; Guide residential development to those areas where: Public sewers are in place prior to residential building construction, or Sewers can be extended, or New technology in the processing of domestic sewerage makes residential development in unsewered areas environmentally acceptable; Guide development of residential areas in such manner as to encourage and plan for the availability of public services and community facilities such as utilities, police and fire protection, streets, schools, parks and recreation; Guide development in such a manner as to provide protection between noncompatible uses.
Permitted uses
Include but are not limited to:
Agriculture
Housing-Single unit
Housing-Multiple units
Housing-Other
Dec 6, 2025 • Final
Electrical
Install electrical wiring for a septic system.
Electrical
Sep 19, 2022 • Final
Mechanical
Work on a heating system.
HVAC
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.