This singular town home has features and amenities for a perfect Burlingame lifestyle. 5 minutes walk to 'The Avenue' with its restaurants and upscale shopping. This home has a surprising 1960 sf of living space including 3 bedrooms 2.5 bathrooms, Office/Family Room, 2 car attached garage, four balconies and yard with patio. Shades of grey warm the living room and a decorative fireplace is a pleasant focal point with plantation shutters adding a timeless modern look. Recessed lighting sets the mood. A mirrored wet bar flows to the dining room and gourmet kitchen. The master bedroom is large enough to handle a California King. Master has walk-in closet and stunning remodeled bathroom with rainfall shower fixture. Two additional bedrooms, with balconies, and second bathroom, complete the upper floor. If location is everything. .. this home has it all.
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
3
Baths
2.5
Stories
3
Lot width
—
Lot depth
—
Lot size
835 Sq. Ft.
Year renovated
1990
Sq. Ft.
1,960
Year built
1978
Style
Townhouse
County
San Mateo County
APN
029360010
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Nov 12, 2026.
BMU
Bayswater Mixed Used District
The Bayswater Mixed-Use (BMU) zoning district is centered on Bayswater Avenue between El Camino Real and Park Road. Development in this zoning district shall be consistent with the existing neighborhood scale of small streets and varied commercial and residential buildings. New development shall maintain the existing pattern at a scale consistent with the adjacent residential areas to serve as a buffer between the downtown commercial district and the residential neighborhoods to the south and east.
Permitted uses
Include but are not limited to:
Bank
Day care facility
Housing-Multiple units
Housing-Other
Mixed use
Office
Public service
Recreation
Veterinary clinic
Park & open space
Oct 31, 2019 • Final
Roofing
Reroof a building with a three-ply capsheet system.
Roofing
Apr 8, 2019 • Final
Fire alarm
Work on an alarm system.
Fire sprinkler
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.