Recently featured on HGTV show "Property Brothers". Recent interior updates include hardwood floor, kitchen counters and backspalsh, fresh paint throughout. Front remodeled in 2005 to Hill Country style. Large level lot with lots of space to add additional footprint or second story. Updated appliances, incredible Central Austin location. Elfa shelving in Master Closet, updated second bathroom. Restrictions: Yes
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
3
Baths
2
Stories
1
Lot width
—
Lot depth
—
Lot size
9,949 Sq. Ft.
Year renovated
—
Sq. Ft.
2,152
Year built
1952
Style
Single Family Residential
County
Travis County
APN
118278
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Oct 22, 2026.
SF-3
Family Residence District
Family residence (SF-3) district is the designation for a moderate density single-family residential use and a duplex use on a lot that is a minimum of 5,750 sq ft. An SF-3 district designation may be applied to a use in an existing single-family neighborhood with moderate sized lots or to new development of family housing on lots that are 5,750 sq ft or more. A duplex use that is designated as an SF-3 district is subject to development standards that maintain single-family neighborhood characteristics.
Permitted uses
Include but are not limited to:
Agriculture-Other
Assembly/ meeting place
Garden center
Day care facility
Housing-Single unit
Housing-Multiple units
Housing-Senior
Bed & breakfast
Educational/school
Communications tower
Feb 14, 2019 • Final
Plumbing
Perform a comprehensive interior remodel of the living room, dining room, kitchen, and office. Work includes removing walls, installing a new kitchen island vent hood, relocating the refrigerator, and creating a new office entry and vestibule. Install new lighting throughout the remodeled area while maintaining existing sink and range locations.
Kitchen
Plumbing
Remodel
Feb 14, 2019 • Final
Building
Perform a comprehensive interior remodel of the living room, dining room, kitchen, and office. Work includes removing walls, installing a new kitchen island vent hood, relocating the refrigerator, and creating a new office entry and vestibule. Install new lighting throughout the remodeled area while maintaining existing sink and range locations.
Kitchen
Remodel
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.
Property details
Parking
Garage/Carport Information
Has Garage
# of Garage Spaces: 1
Parking
Features: Attached, Door-Single, Garage Faces Front, Garage, Garage Door Opener