Updated with a nod to the traditional style of the neighborhood this sunlit stone home with a two car garage is looking for a new owner. A well done sunroom addition is open to the kitchen providing a breakfast nook, lounge area or office. Laundry options include a stack space in the kitchen or a garage area. Built-ins in the secondary bedroom, plus additional storage in the master are convenient. Thoughtful upgrades include new insulation, a recent HVAC, soundproofing between bedrooms and living areas. Restrictions: Yes
Single-familyProperty Type
1942Year Built
6,795 sq ftLot Size
$738Est. Price/Sq.Ft.
2 car garageParking
Listed by Lori Galloway• Kuper Sotheby's International Realty
Bought with Emily Wellings• Berkshire Hathaway TX Realty
*Taxable value of land and structures on it ("additions") is determined regularly by local assessors and does not affect market price.
Public record
Public record
Zoning
Permits
Beds
—
Baths
1
Stories
2
Lot width
50 ft.
Lot depth
135 ft.
Lot size
6,813 Sq. Ft.
Year renovated
—
Sq. Ft.
1,717
Year built
1942
Style
Single Family Residential
County
Travis County
APN
224632
Parking Spaces
—
Basement
—
Accessible
—
HOA Dues
—
Garage
—
Features
—
Last updated by owner on Oct 22, 2026.
SF-3
Family Residence District
Family residence (SF-3) district is the designation for a moderate density single-family residential use and a duplex use on a lot that is a minimum of 5,750 sq ft. An SF-3 district designation may be applied to a use in an existing single-family neighborhood with moderate sized lots or to new development of family housing on lots that are 5,750 sq ft or more. A duplex use that is designated as an SF-3 district is subject to development standards that maintain single-family neighborhood characteristics.
Permitted uses
Include but are not limited to:
Agriculture-Other
Assembly/ meeting place
Garden center
Day care facility
Housing-Single unit
Housing-Multiple units
Housing-Senior
Bed & breakfast
Educational/school
Communications tower
Mar 1, 2022 • Final
Building
Demolish a detached garage and remove all debris from the site.
Demolition
Dec 28, 2021 • Final
Building
Perform a partial demolition and construct a two-story addition to an existing primary residence. The project includes a new kitchen, laundry room, and master suite, along with interior remodeling.
Addition
Kitchen
Remodel
Permit history is from public records and may be incomplete or inaccurate. Redfin and its agents make no representations about the property condition or permit status. Buyers should independently verify all information.